The aim is make a brighter, more attractive space while retaining the look (and practical properties) of cedar and stone.
- The dark (and slippery) slate will be replaced with lighter tiles with a high non-slip rating.
- The spa will be re-tiled in light blue tiles.
- New cedar panelling will be installed, with some feature sections with rock effects.
- The old shower area will become a new toilet stall.
- The old toilet stall will become an open shower.
The toilet stall still has to be built, but the open shower will make the space more open.
Fantastic well done committee
ReplyDelete