17 March 2016

New Swichboard

The original electrical switchboard was practically at capacity and needed to be replaced. This would be a costly but necessary exercise for the future safety of the lodge. This work was undertaken in late January - early February. We now have a modern switchboard with capacity to cater for future growth. All the electrical circuits including switches and power points have been labelled and some minor faults rectified. As an added bonus, many of the power points in the lodge (including in the lounge and mezzanine) now have additional USB power points to cater for our ever increasing number of phones, tablets and laptops.
The new switchboard

2 comments: